Unpacking The Appliance - Worcester 29CDi Classic Installation, Commissioning And Servicing Instructions

Greenstar cdi classic erp wall hung rsf gas fired condensing combination boiler
Hide thumbs Also See for 29CDi Classic:
Table of Contents

Advertisement

4.2

UNPACKING THE APPLIANCE

1. With the wall frame and ancillary items removed
(see section 4.1), lay the carton (A) on its back.
2. Open the carton bottom flaps and fold under boiler. Do not remove
the packaging base.
3. Stand carton (A) with boiler upright on the packaging base (B).
4. Remove outer carton (A) and place safely away from the working
area.
5. Remove the protective wrapping (C).
6. Lie the boiler on its back.
7. Remove the packaging base (B) and place safely away from the
working area.
REMOVING OUTER CASE
8. Loosen but do not remove the 2 screws (E) securing boiler casing at
the bottom of the appliance.
9. Pull upwards to release the clip (F) on top of the boiler and pull the
case upwards.
10.Remove the outer case.
11.Remove the protective packaging (G) from the electrode assembly.
A - Outer carton
B - Packaging base
C - Protective wrapping
D - Appliance outer case
E - Screws
F - Clip
G - Protective packaging
8
E
Fig. 27 Unpacking the boiler
6 720 815 725 (2015/05)
Do not use
the frame as
a handle
7
1.
A
3.
5.
C
Fig. 26 Removing the packaging
6
10
11
G
6 720 815 725-11.1O
INSTALLATION
2.
B
4.
A
B
6720647361-10.1Wo
D
9
F
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

34cdi classic42cdi classic38cdi classic

Table of Contents