Commissioning
8.4 Commissioning the SIPROCESS GA700
8.4
Commissioning the SIPROCESS GA700
Procedure
Startup
①
②
③
Figure 8-1
1. Apply power to the device:
Information on the device power supply is available in the section "References (Page 82)"
and in the device-specific documentation:
The boot process starts. The splash screen is initially visible on the device display.
2. Scan of basic settings:
The boot process is interrupted momentarily. Two successively displayed editing windows
prompt you to select the display language and to enter the date and time.
– Select one of the offered language options in the first editing window.
– Then set the date and time of day.
Once you have entered the requested information, the boot process continues.
64
Product designation
Version of the device firmware
Progress bar
Splash screen
Note
Date/time display
When the power is off, these settings for the date and time are stored on the device for a
period of approximately 14 days.
After putting the device back into operation, you will need to reset the date and time.
Operating Instructions, 05/2022, A5E35640463-07
Field device