Step 11 Installing The Drain Hose And Drain Pipe - Samsung AC BN6PKG Series Installation Manual

Hide thumbs Also See for AC BN6PKG Series:
Table of Contents

Advertisement

Installation Procedure
Insulation type (heating/cooling)
Standard
Pipe size
Pipe
(Less than 30°C,
(mm)
85%)
Ø6.35 to
Ø9.52
Liquid
pipe
Ø12.7 to
Ø19.05
Ø6.35
Ø9.52
Gas
Ø12.70
pipe
Ø15.88
Ø19.05
When installing insulation in the places and
conditions below, use the same insulation that is
used for high humidity conditions.
<Geological condition>
High humidity locations such as shorelines, hot
springs, lake or riversides, and ridges (when part of
the building is covered by earth and sand)
<Operation purpose condition>
Restaurant ceiling, sauna, swimming pool etc.
<Building construction condition>
Ceilings frequently exposed to moisture and cooling
are not covered. For example, pipes installed at a
corridor of a dormitory and studio or near an exit that
opens and closes frequently.
Places (where the pipes are installed) that are highly
humid due to a lack of ventilation.
16
English
High humidity
(Over 30°C,
Remarks
85%)
EPDM, NBR (mm)
9t
9t
13t
13t
The internal
temperature
13t
19t
is higher
than 120°C.
19t
25t
Step 11 Installing the drain hose and
drain pipe
1
Push the supplied drain hose as far as possible over the
drain socket.
2
Tighten the metal clamp as shown in the picture.
3
Wrap the supplied large sealing pad over the metal clamp
and drain hose to insulate and fix it with clamps.
4
Insulate the complete drain piping inside the building
(field supply).
If the drain hose cannot be sufficiently set on a slope, fit
the hose with drain raising piping (field supply).
5
Push the drain hose up to insulation when connecting the
drain hose to drain socket.
Metal clamp
Large seailng pad
Drain hose
CAUTION
Check that the indoor unit is level with the ceiling by using
the leveller.
Drain socket
Drain hose
Drain pipe
Be sure to bond the drain
hose and the main pipe.
PVC Tube Joint
Drain pipe