Miele DGC 7150 Operating And Installation Instructions page 87

Combination steam oven
Table of Contents

Advertisement

You can interrupt and resume the
intake process at any time by
selecting OK.
A message will appear when the intake
process is finished.
 Confirm with OK.
 Provide 1 l of fresh water and follow
the instructions in the display.
The activation phase will begin. You
can follow the time counting down in
the display.
 Leave the container with the tube
connected to the water intake pipe in
the oven compartment.
The system will take in liquid several
times during the activation phase. You
will hear the noise of the pump.
The oven interior lighting and cooling
fan remain switched on for the whole
duration of the process.
At the end of the activation phase, a
buzzer will sound.
Cleaning and care
Rinsing the steam injection system
after the activation phase
After the activation phase, the steam
injection system must be rinsed out
with cold fresh water to remove
residues of descaling agent.
To do this, approx. 1 litre of fresh water
is pumped through the steam injection
system three times and is collected in
the universal tray.
Rinse the container thoroughly after
the first rinse to remove any descaling
agent residue.
 Follow the instructions in the display.
After the third rinse, the pump will run
for approx. 1 minute to pump the
remaining water out of the steam
injection steam.
 Follow the instructions in the display.
 Remove the universal tray, container
and plastic tube.
 Confirm with OK.
The rinsing process is complete.
87

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgc 7250

Table of Contents