Setting Up The Sp605 Board For The Brd Demonstration; Installing The Application Gui - Xilinx Spartan-6 FPGA SP605 Getting Started

Evaluation kit
Hide thumbs Also See for Spartan-6 FPGA SP605:
Table of Contents

Advertisement

X-Ref Target - Figure 1-2
GMII
Ethernet
PC
PHY
MDIO

Setting Up the SP605 Board for the BRD Demonstration

Installing the Application GUI

The Base Reference Design includes an application GUI that must be installed before
running the demonstration. On the USB flash drive included with the kit, locate the install
image:
SP605_BRD_Reference Design → SP605_BRD_Application →
BaseRefDISetup2_0_5.msi
This application is used to display the graphical information for the Base Reference
Design. Double-click the MSI file to install the software.
Note:
http://www.microsoft.com/NET/
When running BaseRefDISetup2_0_5.msi, an Unknown Publisher Warning appears.
Click Run, then click Next in the Base Reference Design Interface Setup Wizard.
Spartan-6/SP605 Getting Started Guide
UG525 (v1.3) March 29, 2011
Getting Started with the Base Reference Design Demonstration
Packet
Processing
1000 Mb/s
Engine
100 Mb/s
Ethernet
MAC
Management
PicoBlaze
Ethernet Management
Transceiver
Figure 1-2: SP605 Base Reference Design Block Diagram
The Windows .NET Framework might need to be installed or updated. Go to
www.xilinx.com
MIG Memory Interface
Gamma
Image Processing
Link
Status
Loopback
Test
GTP
and click Get the .NET Framework.
DDR3
FIR
Inverse
Filters
Gamma
UG525_02_101710
DVI
Output
9

Advertisement

Table of Contents
loading

Table of Contents