Configuring the BAP120 the first time it
is powered up
Configure the BAP120 the first time it is powered up using the Business
Element Manager.
Prerequisites
Procedure steps
Step
1
2
3
Copyright © 2006, Nortel Networks
.
The Business Element Manager must be installed.
Action
Start the Element Manager.
Choose Network > Find Network Elements > Business Access
Point from the Element Manager menu.
Enter the range 192.168.1.1 to 192.168.1.255, and then click OK.