5.2.2
Properties of the base area
Properties of the base area
To ensure the stability of the charging station, the base area must meet the following
requirements:
• Level
• Dry
• Sufficiently solid and capable of bearing the load (e.g. concrete area in quality class
C30/37)
5.2.3
Minimum clearances
To operate, maintain and ensure ventilation of the charging station, maintain the following
minimum distances (in mm):
①
Required distance to raise and lower the charging station during installation.
②
Distance between charging stations.
③
•
At 100 ... 600 mm distance, you must move the charging station for maintenance.
•
At a distance of 600 mm or more, you can service the charging station without restriction.
④
Required distance at the front of the charging station
⑤
Required distance to open the control cabinet door by more than 90°. Less distance is permitted, but the opening
angle is smaller.
Figure 5-4 Minimum clearances
SICHARGE UC 150
Operating Instructions, 02/2023, A5E50068475-AB
Preparing for use
5.2 Location planning
51