Rinnai RH-KT2959-GBV Operation & Installation Manual page 19

Slant hood
Table of Contents

Advertisement

Preparing the Installation
Ensure that there are no electrical wires, gas pipes or water pipes in the area where holes
are to be drilled.
Step 1 (Fig. 6)
Fig. 6 1=1 Installation
Attaching and Aligning the Extractor Hood
Step 2 (Fig. 7, Fig. 7. 1, Fig. 7. 2)
Fig.7
Fig. 6. 1
Fig. 7
Determine where the extractor hood should
be positioned and lightly mark where the
lower edge of the appliance should be on
the wall. Determine where the middle
should be based on the hob. (Fig. 6)
Place the template against the line drawn
on the wall and tape it in place. Mark the
area where the screws should be inserted.
Drill 8mm diameter holes to a depth of
40mm for fastening the appliance, remove
the template and press in the wall plugs
flush with the wall and mount the screws
(Do not tighten) (Fig. 6. 1)
Mount the appliance onto the wall and do
ensure that it is properly engaged with the
mounting screws 3 & 4 (Fig. 7)
If there is a need to realign the appliance,
adjust the screws on the top of the motor
housing (Fig. 7. 1)
19

Advertisement

Table of Contents
loading

Table of Contents