Appendix B: Point Address Chart; Zonex 1, Points 9 To 40 - Bosch D7212GV3 Operation And Installation Manual

Hide thumbs Also See for D7212GV3:
Table of Contents

Advertisement

.

Appendix B: Point Address Chart

Place the labels on the base of the POPIT. Do not attach labels to the POPIT cover.
A bullet (•) in the switch column indicates that the switch is set to ON.
Use D9127 POPITs for Points 9 to 40. D9127 POPITs have DIP switches 0 to 6.
Bosch Security Systems, Inc. | 10/10 | F01U143079-03
D7212GV3 | Operation and Installation Guide | Appendix B: Point Address Chart
Table 21:

Zonex 1, Points 9 to 40

Switch
Address
0
1
009
010
011
012
013
014
015
016
017
018
019
020
021
022
023
024
025
026
027
028
029
030
031
032
034
035
036
037
038
039
040
2
3
4
5
6
55

Advertisement

Table of Contents
loading

Table of Contents