Trane Horizon OADG Series Installation, Operation And Maintenance Manual page 28

Outdoor air unit, indirect fired gas/electric heat/air source heat pump
Table of Contents

Advertisement

Unit Weight and Rigging
Figure 28. Ten-point lift (OAN cabinet with exhaust fan
and no ERV)
SPREADER BARS
DETAIL B
Figure 29. Ten-point lift (OAN cabinet with ERV section)
SPREADER BARS
DETAIL C
28
Before proceeding, refer to
and
Figure 23, p. 27
1. Rig the unit as shown in
2. Install a lifting bar, as shown in
3. Test-lift the unit to ensure it is properly rigged and
4. Lift the unit and position it into place. Remove fork
5. Downflow units; align the base rail of the unit with the
DETAIL B
S
SCREW PIN SHACKLE
10 LOCATIONS
DETAIL C
SCREW PIN SHACKLE
10 LOCATIONS
Table 1, p.
Table 3, p. 26
for typical unit operating weights and
for rigging drawing.
Figure 23, p.
adequate strength lifting slings to all lifting brackets in
the unit base rail. Do not use cables, chains, or slings
except as shown.
protect the unit and to facilitate a uniform lift. The
minimum distance between the lifting hook and the
top of the unit should be 7 feet.
balanced, make any necessary rigging adjustments.
pockets prior to setting on the curb.
curb rail while lowering the unit onto the curb. Make
sure that the gasket on the curb is not damaged while
positioning the unit.
25,
Table 2, p. 26
27. Attach
Figure 23, p.
27, to
OAU-SVX006E-EN