Task flow navigation
16-slot Passport switch installation supporting information
Site preparation
•
"Unpacking a 16-slot Passport switch" (page 420)
•
"Installing a 16-slot Passport switch shelf" (page 225)
•
"Grounding a 16-slot Passport switch" (page 190)
•
"Installing a 16-slot Passport switch cooling unit" (page 220)
•
"Installing a shelf interconnect cable" (page 251)
•
"Installing an ac power cable" (page 255)
•
"Installing dc power cables in a 16-slot Passport switch" (page 272)
•
"Installing ferrite beads onto dc power cables" (page 283)
•
"Installing a 16-slot Passport switch power supply" (page 222)
•
"Installing a control processor" (page 232)
•
"Installing a function processor" (page 237)
•
"Powering up a 16-slot Passport switch" (page 318)
•
"Changing fasteners on an MSA32 sparing panel" (page 178)
•
"Installing multiple MSA32 sparing panels (DB15 or BNC)" (page 286)
•
"Installing an MSA32 sparing panel cable cover" (page 262)
•
"Installing multiple MSA32 sparing panels (RJ45)" (page 289)
•
"Installing a 19" rack-mounted termination panel" (page 205)
•
"Installing FP cables" (page 278)
Site preparation means planning ahead for the location of your Passport
switch and preparing the site for anchoring a Passport cabinet or rack. See the
appropriate sections for more information.
•
"Site preparations for all installations" (page 54)
•
"Site preparation for a Passport cabinet" (page 55)
•
"Site preparation for a seismic cabinet" (page 56)