16-Slot Passport Switch Installation Supporting Information - Nortel Passport 7400 Hardware Installation, Maintenance, And Troubleshooting

Hide thumbs Also See for Passport 7400:
Table of Contents

Advertisement

Task flow navigation

16-slot Passport switch installation supporting information

Site preparation
"Unpacking a 16-slot Passport switch" (page 420)
"Installing a 16-slot Passport switch shelf" (page 225)
"Grounding a 16-slot Passport switch" (page 190)
"Installing a 16-slot Passport switch cooling unit" (page 220)
"Installing a shelf interconnect cable" (page 251)
"Installing an ac power cable" (page 255)
"Installing dc power cables in a 16-slot Passport switch" (page 272)
"Installing ferrite beads onto dc power cables" (page 283)
"Installing a 16-slot Passport switch power supply" (page 222)
"Installing a control processor" (page 232)
"Installing a function processor" (page 237)
"Powering up a 16-slot Passport switch" (page 318)
"Changing fasteners on an MSA32 sparing panel" (page 178)
"Installing multiple MSA32 sparing panels (DB15 or BNC)" (page 286)
"Installing an MSA32 sparing panel cable cover" (page 262)
"Installing multiple MSA32 sparing panels (RJ45)" (page 289)
"Installing a 19" rack-mounted termination panel" (page 205)
"Installing FP cables" (page 278)
Site preparation means planning ahead for the location of your Passport
switch and preparing the site for anchoring a Passport cabinet or rack. See the
appropriate sections for more information.
"Site preparations for all installations" (page 54)
"Site preparation for a Passport cabinet" (page 55)
"Site preparation for a seismic cabinet" (page 56)
Passport 7400 Hardware Installation, Maintenance, and Upgrade 5.2S1
Chapter 5 16-slot Passport switch installation 53

Advertisement

Table of Contents
loading

Table of Contents