Maytag Amana PMH Series Service And Troubleshooting page 17

Package terminal air conditioner/heatpump
Table of Contents

Advertisement

SYSTEM OPERATION
Jumper Placement
Description
BATTERY POWERED
NOTE: For battery powered, the 2 jumpers must be posi-
tioned on the center and left pins. See jumper pin location
in photo above.
POWERED CONNECTION
NOTE: For external power connection, the 2 jumpers must
be positioned on the center and right pins. See jumper
location in photo above.
Jumper in position
for external power
External Power
Connections
Wired Door Switch
Connections
TERMINAL BLOCK
TWO JUMPERS MOVED TO
"EXT POWR"
Mounting Sensor/Door Magnet Installation for DD01e
AND dd01f Kits
DDO1E and DD01F must be mounted on the top door
frame as close to the door as possible in the horizontal
position.
A DT01A must be installed in the PTAC unit for the DD01E
or DD01F to be operable.
Skip these steps if not installing.
1. Remove motion sensor from mounting plate by pulling
apart.
2. Mount the back plate on the door trim directly above
the door using the enclosed screws. (Position so the
UP arrow is pointing up.) Mount the DD01E as low as
possible on the door frame to be as close to the moving
part of the door as possible without interfering with the
door opening or closing. Choose a location for mount-
ing the back plate that will provide good coverage of the
PIR for motion into the room. Make sure that the DD01E
will not interfere with the normal opening and closing of
the door.
DO NOT SNAP MOTION SENSOR IN PLACE UNTIL
AFTER BINDING PROCESS.
See Binding instructions.
DOOR TRIM
DD01E and DD01F Mounting
DD01*
DOOR
(CENTER MAGNET WITH
DD
01*)
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents