To verify the HBA is properly installed and is operating:
1. Turn on the computer.
2. At power up, observe the POST LED indicators on the HBA. The position of
Table 3: Normal POST LED Indicators
Amber LED (L1)
Off
On
Slow blink (1 Hz)
Fast blink (4 Hz)
Flashing (irregular)
Off
On
Slow blink (1 Hz)
Fast blink (4 Hz)
Off
28
the POST LED indicators is defined in
green LED indicates power functions and the amber LED signifies port
activity. The amber LED blinks at all times during normal operation.
lists normal LED indications.
Figure 1
Green LED (L2)
Off
Wake-up failure (dead board)
Off
POST failure (dead board)
Off
Wake-up failure (dead board)
Off
Failure in POST (dead board)
Off
POST processing in progress
On
Failure while functioning
On
Failure while functioning
On
Normal—1 Gb link rate
On
Normal—2 Gb link rate
Blink (1 Hz)
Normal—link down or not yet started