Horizontal To Downflow Conversion; Condensate Drain; Electrical Wiring; Pre-Electrical Checklist - Nordyne iHybrid DF6SF Series Installation Instructions Manual

Dual fuel heating & cooling packaged system
Hide thumbs Also See for iHybrid DF6SF Series:
Table of Contents

Advertisement

Horizontal to Downflow Conversion

The unit is shipped ready for horizontal duct connections.
If down flow ducts are required, the unit must be converted
following the steps below for both the supply and return
ducts.
1. Remove both horizontal duct caps.
2. Locate the duct cap inside the duct openings and remove
the screw holding it in place.
3. Lift the cap out of the unit. (Hint: The cap can be pushed
up from the bottom by reaching through the fork slot).
4. Cover the horizontal duct openings with the horizontal
duct caps. The insulation will be on the indoor side.
5. Fasten the cover with screws to seal.

Condensate Drain

Condensate is removed from the unit through the 3/4"
female pipe fitting (Figure 5) located on the front side of
the unit. Install a 2 inch condensate trap in the drain line of
the same size and prime with water. When connecting rigid
drain line, hold the female fitting with a wrench to prevent
twisting. Do not over tighten! Refer to local codes and
restrictions for proper condensate disposal requirements.
Figure 4. Roof Top Installation
Condensate Drain
Figure 5. Condensate Drain location
10

ElECtRICAl WIRInG

WARnInG:
ELECTRICAL SHOCK, FIRE OR
EXPloSIon HAZARD
Failure to follow safety warnings exactly could
result in serious injury or property damage.
Improper servicing could result in dangerous
operation, serious injury, death or property
damage.
• Before servicing, disconnect all electrical
power to furnace.
• When servicing controls, label all wires prior
to disconnecting. Reconnect wires correctly.
• Verify proper operation after servicing."
AVERtISSEMEnt:
RISQUE DE CHOC ÉLECTRIQUE,
D'InCEnDIE oU D'EXPloSIon
Le non-respect des avertissements de
sécurité pourrait entraîner un fonctionnement
dangereux de l'appareil, des blessures graves,
la mort ou des dommages matériels.
Un entretein incorrect pourrait entraîner un
fonctionnement dangereux de l'appareil, des
blessures graves, la mort ou des dommages
matériels
• Couper toute alimentation électrique au
générateur d'air chaud avant de prodéder
aux travaux d'entretein.
• Au moment de l'entretien des commandes,
étiquetez tous les fils avant de les débrancher.
S'assurer de les raccorder correctement.
• S'assurer que l'appareil fonctionne
adéquatement aprés l'entretien.
• Electrical connections must be in compliance with
all applicable local codes and ordinances, and with
the current revision of the National Electric Code
(ANSI/NFPA 70).
• For Canadian installations the electrical connections
and grounding shall comply with the current Canadian
Electrical Code (CSA C22.1 and/or local codes).

Pre-Electrical Checklist

√ Verify the voltage, frequency, and phase of the supply
source match the specifications on the unit rating plate.
√ Verify that the service provided by the utility is sufficient
to handle the additional load imposed by this equipment.
See Table 2 (page 11) or the unit wiring label for proper
high and low voltage wiring.
√ Verify factory wiring is in accordance with the unit wiring
diagrams. Verify none of the connections loosened during
shipping or installation. See Figures 15-18 (pgs 31-34).