5. Installation
12. Install the copper bars (28 pieces) between adjacent batteries and the screws (Figures 5-51A and 5-51B).
Figure 5-51A
Figure 5-51B
13. Connect the cables from battery 1+ to BAT+ copper bar, battery 10- to BAT N copper bar, battery 11+ to BAT N copper
bar, battery 20- to BAT- copper bar and the layer's connecting cables (Figures 5-52A and 5-52B).
Figure 5-52A
Figure 5-52B
53