5. Installation
8. Install 10 battery packs in the next layer (L2-A, group 2 positive string). Be sure to keep terminal sides of all batteries up
(Figure 5-8A).
9. Install another 10 battery packs in the layer (L2-B, group 2 negative string). Be sure to keep terminal sides of all batteries
up (Figure 5-8B).
10. Reinstall the right side and left side bracket bars of group 2 batteries (Figures 5-9A and 5-9B).
Figure 5-8A
Figure 5-9A
26
Figure 5-8B
Figure 5-9B