Tripp Lite BP240V09 Owner's Manual page 28

Extended-run battery cabinet
Table of Contents

Advertisement

Available languages

Available languages

5. Installation
14. Install 10 battery packs in the next layer (L4-A, group 4 positive string). Be sure to keep terminal sides of all batteries up
(Figure 5-12A).
15. Install another 10 battery packs in the layer (L4-B, group 4 negative string). Be sure to keep terminal sides of all batteries
up (Figure 5-12B).
16. Reinstall the right side and left side bracket bars of group 4 batteries (Figure 5-13A and 5-13B).
Figure 5-12A
Figure 5-13A
28
Figure 5-12B
Figure 5-13B

Advertisement

Table of Contents
loading

Table of Contents