Tripp Lite BP240V09 Owner's Manual page 30

Extended-run battery cabinet
Table of Contents

Advertisement

Available languages

Available languages

5. Installation
17. Use 36 battery shorting/jumpers to connect the terminals of the adjacent batteries on the positive side of the battery
cabinet (Figure 5-14A).
18. Use 36 battery shorting/jumpers to connect the terminals of the adjacent batteries on the negative side of the battery
cabinet (Figure 5-14B).
10
10
10
10
Figure 5-14A: The left side of the cabinet
is the positive side of the battery strings.
19. Connect group 1 battery 10- to N battery bus bar (BAT N) (Figure 5-15A).
Note: In steps 19 through 29, the cabinet diagrams show only the specific cable being referenced in each sequential step to avoid confu-
sion with previously installed cables. However, each step is an accumulation of cable connections. Refer to the wiring connection diagram in
Figure 5-32 for details.
20. Connect group 1 battery 11+ to N battery bus bar (BAT N) (Figure 5-15B).
10
10
10
10#
10
1
1
1
1
1
1
1
1
Figure 5-15A
30
20
20
20
20
Figure 5-14B: The right side of the cabinet
is the negative side of the battery strings.
20
20
20
20
Figure 5-15B
11
11
11
11
11
11
11
10#
11

Advertisement

Table of Contents
loading

Table of Contents