Shutdown

1. Follow Pressure Relief Procedure, page 24.
2. Flush mix manifold, hoses, and gun. See Flush Mix
Manifold, Hose, and Spray Gun, page 30.
3. Close the main air shutoff valve (CA).

Park

1. Open the circulation handle (AC) and adjust the air
regulator (CB) so that the pump runs slowly.
2. Close the circulation handle (AC) when the pump is
at the bottom of the stroke.
3. Close the air regulator (CB) and open the circulation
handle (AC).