HP HPE ProLiant DX360 Gen10 User Manual page 92

Table of Contents

Advertisement

CAUTION: To prevent damage to electrical components, properly ground the server before beginning any
installation procedure. Improper grounding can cause electrostatic discharge.
2.
Back up all server data.
3.
Power down the server.
4.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5.
Do one of the following:
a. Extend the server from the rack.
b. Remove the server from the rack.
6.
Remove the access panel.
7.
Remove the primary PCI riser cage.
8.
Remove the expansion slot blank.
9.
Use a T-10 Torx screwdriver to Install the expansion board.
Hardware options installation
92

Advertisement

Table of Contents
loading

Table of Contents