Adjusting The Timing Relation Between The Looper And Needle Bar - JUKI MF-7900 Series Engineer's Manual

High-speed, cylinder-bed top and bottom coverstitch machine
Hide thumbs Also See for MF-7900 Series:
Table of Contents

Advertisement

(8) Adjusting the timing relation between the looper and needle bar

WARNING :
Turn OFF the power before starting the work so as to prevent accidents caused by abrupt start of the
sewing machine.
1.
Timing relation between the looper and the needle bar (synchronization)
It is the standard that dimension A is the same as dimension B when the needle bar goes up from
the lower dead point, the blade point of looper passes the rear of needle, and the left end of right nee-
dle aligns with the blade point of looper, and when the needle bar comes down from the upper dead
point, the blade point of looper passes the front of needle, and the right end of right needle aligns with
the blade point of looper.
(Looper timing is more advanced by a piece of needle than the needle bar timing.)
Going of looper
Standard adjustment
– 20 –
Returning of looper

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mf-7900d seriesMf-7900-h22Mf-7900-h23

Table of Contents