Installing The Module In A Rack; Cabling The External Optical Bypass Module - Cisco SCE 1000 2xGBE Installation And Configuration Manual

Cisco systems router installation and configuration guide
Hide thumbs Also See for SCE 1000 2xGBE:
Table of Contents

Advertisement

Installing the External Bypass Module

Installing the Module in a Rack

The following procedure describes how to install the module in the rack.
Note that, although each module is shipped with its own mounting panel, it is not necessary to
install each module in a separate mounting panel. Up to three modules may be installed in one
mounting panel.
To install the External Optical Bypass module in a 19" rack, complete the following steps:
Step 1
Using the screws attached to the module, screw it into an empty position in the mounting panel.
Step 2
Secure the module panel to the two front posts of the rack above the SCE 1000 platform. Leave at
least 1.5 cm vertical clearance between the SCE 1000 platform and the module panel to provide
space for the cables from the front panel of the module to the rear of the SCE 1000 platform.
The module can now be cabled as explained in the next section.
If only one or two External Optical Bypass modules are deployed in one panel, the empty third position
Note
can be used for transferring the cables, thus saving rack space.

Cabling the External Optical Bypass Module

The following procedure describes how to cable the External Optical Bypass module. Note the
following:
Figure A-4: Bypass Connector on the Rear of the SCE 1000
Cisco SCE 1000 2xGBE Installation and Configuration Guide
A-4
All connections to the External Optical Bypass module are on the front panel of the module.
Connect the fiber (steps 3 and 4) to the GBE ports 1 and 2 on the front panel of the SCE 1000
platform.
Connect the control cable to the Bypass 9-pin D-Type connector on the rear of the SCE 1000
platform.
Appendix A
The External Optical Bypass Module
OL-7821-05

Advertisement

Table of Contents
loading

Table of Contents