Connecting Cooling Pump - Grizzly G0931 Owner's Manual

47" x 47" cnc router w/t-slot table
Table of Contents

Advertisement

Connecting Cooling
Pump
The Model G0931 includes an external pump that
cools the spindle motor. Coolant tubes come pre-
installed on the motor and run through the cable
carrier. The tube must be connected to the pump
and submerged within a coolant reservoir.
A minimum of 4 gallons of water is required for
normal operations. Hot conditions may require
more coolant. If environmental temperatures are
below freezing, 50/50 anti-freeze must be added.
Operating the router without the cooling
pump may damage the internal components
of the spindle motor.
To connect cooling pump:
1.
Drill two
" holes and one 1" hole in lid of
3
8
5-gallon bucket.
2.
Locate both coolant tubes under bed at
rear of machine, then insert each coolant
tube through
" holes in bucket lid (see
3
8
Figure 11).
3.
Insert cooling pump plug and cooling pump
power cord through 1" hole in lid (see
Figure 11).
Power
Cable
Return
Pump
Tube
5-Gallon
Bucket
Figure 11. Connected cooling system.
Model G0931 (Mfd. Since 02/21)
Coolant
Tube
Router
4.
Connect either coolant tube from back
of machine to cooling pump outlet (see
Figure 12).
Outlet
Figure 12. Cooling pump inlet and outlet.
5.
Place pump and return tube in 5-gallon buck-
et (see Figure 11).
High mineral content or dirty coolant can
cause buildup and damage spindle motor.
Do not use tap water if water quality is poor.
6.
Fill bucket with 4 gallons of distilled water.
Make sure pump is completely submerged.
7.
Secure bucket lid.
Inlet
-19-

Advertisement

Table of Contents
loading

Table of Contents