Lifting & Placing
Straining or crushing injury
may occur from improperly
lifting machine or some of
its parts. To reduce this
risk, use a forklift (or other
lifting equipment) rated for
weight of this machine.
Do not attempt to lift or move this machine without
using the proper lifting equipment (such as forklift
or crane) or the necessary assistance from other
people. Each piece of lifting equipment must be
rated for at least 1000 lbs. to support dynamic
loads that may be applied while lifting. Refer to
Needed for Setup on Page 15 for complete list
of needed equipment for setup and installation.
Tools Needed
Forklift or hoist (rated for 1000 lbs.) .................. 1
To lift and move machine:
1.
Move crate to machine work site.
2.
Remove crate top and sides, small items
inside crate, and blocks around machine
base.
3.
Lift machine with forklift or hoist just enough
to clear pallet, then move pallet out of the
way and return machine to the ground.
Note: Lift machine by the underside of
machine body and between the leveling feet.
-18-
HEAVY LIFT!
Qty

Leveling

For accurate cutting results and to prevent
warping the table and frame MUST be
leveled from side to side and from front to
back on both ends. Re-check the table and
frame 24 hours after installation, two weeks
after that, and then annually to make sure
they remain level.
Leveling machinery helps precision components
remain straight and flat during the lifespan of the
machine. Components on a machine that are not
level may slowly twist due to the dynamic loads
placed on the machine during operation.
Adjust leveling feet and use a level to check each
axis. Repeat as needed.
Figure 10. Leveling foot.
Connecting Cooling
Pump
The Model G0894 includes an external pump that
cools the spindle motor. Coolant tubes come pre-
installed on the motor and run through the cable
carrier. The tube must be connected to the pump
and submerged within a coolant reservoir.
A minimum of 4 gallons of water is required for
normal operations. Hot conditions may require
more coolant. If working environment reaches
temperatures below freezing, anti-freeze must be
added.
Model G0894 (Mfd. Since 05/19)