EverFocus EPN Series User Manual page 23

Ip speed dome
Table of Contents

Advertisement

8. Put on the supplied gloves before pushing upward the main body into the top housing. Draw
out the provided rope from the housing and hook it on the rope attachment hook of the main
body
9. Make sure the red triangle
the outside of the main body. Push the main body upward into the top housing until the orange
catches on both sides click into position.
Top Housing
Main Body
Note:
1. To release the main body, press the two orange release buttons on both sides. Make sure
you are holding the main body firmly, otherwise it will fall down.
2. To protect the glass dome from getting dirty and scraped up, please put on the supplied
gloves before installing.
on the inside of the top housing lines up with the red triangle on
17
EPN4220d/4220di

Advertisement

Table of Contents
loading

This manual is also suitable for:

Epn4220dEpn4220di

Table of Contents