Genie Z-51/30 Service Manual page 374

Table of Contents

Advertisement

Section 7 • Repair Procedures
PRIMARY BOOM COMPONENTS
21 Lower the rod end of the primary boom lift
cylinder approximately 12 inches (30.5 cm).
22 Pull all of the hoses and cables out and away
from the mounting ears for the rod end of the
primary boom lift cylinder.
23 Raise the rod end of the primary boom lift
cylinder back into position and install the rod-
end pivot pin. Then install the pin retaining
fastener.
24 Attach a strap from an overhead crane to the
cable track.
25 Remove the mounting fasteners from the upper
cable track at the platform end of the extension
boom.
26 Remove the cable track mounting fasteners that
attach the lower cable track to the primary
boom.
27 Remove the cable track from the machine and
place it on a structure capable of supporting it.
Crushing hazard. The cable track
may become unbalanced and fall
if it is not properly attached to the
overhead crane.
Component damage hazard.
Cables and hoses can be
damaged if they are kinked or
pinched.
7 - 26
How to Repair the Primary Boom
Cable Track
1 Use a slotted screwdriver to pry down on the
lower clip.
2 To remove a single link, open the lower clip
and then use a screw driver to pry the link to
the side.
3 Repeat steps 1 and 2 for each link.
Genie Z-45/25 & Genie Z-45/25J
First Edition • Second Printing
Component damage hazard. The
primary boom cable track can be
damaged if it is twisted.
A 7 link repair section of cable
track is available through
the Genie Industries
Service Parts Department
(Genie part number 58919).
a
link separation point
b
lower clip
Part No. 52709
a
b

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-45/25jZ-45/25Z-45 xc

Table of Contents