Start Up Check List - Hussmann Q-Series Installation & Operation Manual

Medium temperature self contained
Table of Contents

Advertisement

P/N 0562873_M
Equipment Start-Up Check List:
Step
Locate, read and maintain install/operation manual in a safe place for
1
future reference.
2
Examine unit. Confirm there is NO damage or concealed damage.
3
Level the unit, side to side and front to rear.
4
Remove all shipping brackets and straps
Unit must be run on a dedicated electrical circuit without the use of
5
an extension cord.
Ensure that the proper electrical requirements for the equipment are
6
supplied.
7
Verify lights turn on and off and there is no exposed wiring.
8
Check that shelves are installed evenly.
LEGAL DISCLAIMER:
Hussmann shall not be liable for any repair or replacements made without the written consent of Hussmann, or when the product is installed or operated in a manner
contrary to the printed instructions covering installation and service which accompanied such product.
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Startup Activity
Check
Q1, Q2, Q3 Merchandisers
1-5

Advertisement

Table of Contents
loading

Table of Contents