Rgd Check List - Hussmann RGD Installation & Operation Manual

Upright deli case
Table of Contents

Advertisement

• Check cases in and evaluate for missing or loose parts on each unit
• Create a list of any parts that are missing or damaged along with photos of damaged parts and submit PM to obtain
parts (Aftermarket Parts)
• Ensure all lighting, including canopy and shelves, are fully functional
• Ensure that all case settings are intact by;
1) Accessing the case controller
2) Check the Danfoss AKC-210-CC controller's set point is 24 degrees

12. RGD Check List

29

Advertisement

Table of Contents
loading

Table of Contents