FOR THE FOLLOWING ITEMS, TAKE SPECIAL CARE DURING CONSTRUCTION AND
CHECK AFTER INSTALLATION IS FINISHED.
a. Items to be checked after completion of work
Items to be checked
Does the power supply voltage correspond to The unit may malfunction or the components
Is something blocking the air outlet or inlet of
Are refrigerant piping length and additional
b. Items to be checked at time of delivery
Also review the SAFETY CONSIDERATIONS.
Items to be checked
c. Points for explanation about operations
The items with
to possibilities for bodily injury and material damage in addition to the general usage of the product.
your customers to read the operation manual.
NOTE TO THE INSTALLER
different functions, and adjusting the temperature) by having them carry out operations while looking at
the manual.

3. SELECTING INSTALLATION SITE

on-to any plastic or piping parts such as refrigerant or drain piping.
insulation to the main unit body.
the ceiling opening.>
3P184443-12N
28
WARNING or
CAUTION mark in the operation manual are the items pertaining
English
occur:
The units may drop, vibrate or make noise.
The unit may malfunction or the components
may burn out.
Condensate water may drip.
Condensate water may drip.
may burn out.
The unit may malfunction or the components
may burn out.
Danger of electrical leakage.
The unit may malfunction or the components
may burn out.
The refrigerant charge in the system is not clear.
EDUS391300-F9
Check
Check
6
3P184443-12N