Preparations Before Installation - Daikin FXZQ-MVJU9 Engineering Data

4-way ceiling mounted cassette unit
Table of Contents

Advertisement

Installation
Air outlet in 4 directions
Use suspension bolts for installation. Check whether the ceiling is strong enough to support
the weight of the unit or not. If there is a risk, reinforce the ceiling before installing the unit.
requiring reinforcing.)

PREPARATIONS BEFORE INSTALLATION

(1) Relation of ceiling opening to unit and suspension bolt position.
NOTE
Installation is possible with a ceiling
However, to achieve a ceiling-panel
spacing between the ceiling and the unit
between ceiling and the unit is over
part or recover the ceiling.
(2) Make the ceiling opening needed for installation where applicable.
Create the ceiling opening required for installation. From the side of the opening to the casing
wireless type) and wiring between units. Refer to each PIPING or WIRING section.
After making an opening in the ceiling, it may be necessary to reinforce ceiling beams to keep the
ceiling level and to prevent it from vibrating. Consult the builder or engineer for details.
3P184443-12N
30
Piping
Air outlet in 3 directions
Refrigerant
piping
Suspension
A
Fig. 3
False ceiling
English
Piping
Air outlet in 2 directions
False
ceiling
13/16 ≤
View as seen from A
Ceiling material
<
1-3/4
Fig. 5
EDUS391300-F9
Piping
23 – *26
Hanger
bracket
13/16 ≤
False ceiling
<
1-3/4
FXZQ-MVJU9
8