Installing The Application Gateway - Avaya AG250 Hardware Installation Manual

Application gateway server
Hide thumbs Also See for AG250:
Table of Contents

Advertisement

Chapter 1

Installing the Application Gateway

Installing the Application Gateway
Installing the Application Gateway
1
2
3
4
12
Application Gateway Hardware Installation Guide
When installing the Application Gateway, refer to the following
illustration for port locations.
To install the Application Gateway:
Install the Application Gateway in a rack (if rack-mounted).
Connect the power cord to the AC power receptacle.
Connect the 10/100 RJ45 NIC connectors located on the Application
Gateway back panel as follows.
If the Application Gateway can access the connected device (router,
application server, etc.) from the same subnet as it receives client
requests, use one network cable. Connect Application Gateway
interface port 0 (LAN1) to your network. This is the typical
configuration.
If the Application Gateway will straddle two networks, use two
network cables:
Connect Application Gateway Interface 0 (LAN1) to the client-side
network.
Connect Application Gateway Interface 1 (LAN2) to the
server-side network, directly or indirectly.
Connect the null-modem cable to the 9-pin serial port on the Application
Gateway and connect the cable to a computer that is capable of running
terminal emulation software.

Advertisement

Table of Contents
loading

Table of Contents