Section 4: Installation And Startup; General Installation Guidelines; Required Materials; Power Supply - Emerson RXi2-XP Hardware Reference Manual

Table of Contents

Advertisement

Hardware Reference Manual
GFK-3022E
Installation and Startup
Section 4:
This chapter describes the installation and initial startup operations. Because the unit is available
in several options, the description in this chapter is related to the standard configuration.
WARNING
Before installing or removing any component, make sure that the system power and external supplies have
been turned off.
CAUTION
Static-sensitive Devices: Handle only at static-safe work stations.
CAUTION
Drain static electricity before you install or remove any parts. Installing or removing modules without observing
this precaution could result in damage to this and/or other components in your system.
4.1

General Installation Guidelines

Adhere to the following guidelines during installation:
4.2

Required Materials

The following items are required to start the RXi2-XP IPC in a standard configuration:
4.2.1

Power Supply

WARNING
Verify that the power supply is turned off while installing boards or modules into the RXi2-XP IPC.
Adhere to the following guidelines:
Installation and Startup
Observe all safety procedures to avoid damaging the system and protect operators
and users.
Before installing or removing any board, verify that the system power and external
supplies have been turned off.
Verify that the jumpers (if any) are correctly configured for your application.
Make sure the RXi2-XP IPC is properly mounted.
Connect all I/O cables.
Do not restore power until all components are fitted correctly into the system and all
connections have been made properly.
Power supply
Keyboard and mouse
Video monitor
Installation and Startup
September 2021
14

Advertisement

Table of Contents
loading

Table of Contents