Installation And Startup; General Installation Guidelines; Required Materials - Emerson RXi2-UP Hardware Reference Manual

Hide thumbs Also See for RXi2-UP:
Table of Contents

Advertisement

RXi2-UP IPC Hardware Reference Manual
GFK-3047D
Section 5:
This chapter describes the installation and initial startup operations. Because the unit is
available in several configurations, the description in this chapter is related to a standard
configuration.
Before installing or removing any component, make sure that the system power and
external supplies have been turned off.
Static-sensitive Devices: Handle only at static-safe workstations.
Drain static electricity before you install or remove any parts. Installing or removing
modules without observing this precaution could result in damage to this and/or other
components in your system.
5.1

General Installation Guidelines

Adhere to the following guidelines during installation:
5.2

Required Materials

The following items are required to start the RXi2-UP IPC in a standard configuration:

Installation and Startup

Installation and Startup
WARNING
CAUTION
CAUTION
Observe all safety procedures to avoid damaging the system and protect
operators and users.
Before installing or removing any board, verify that the system power and external
supplies have been turned off.
Verify that the jumpers (if any) are correctly configured for your application.
Make sure the RXi2-UP IPC is properly mounted.
Connect all I/O cables.
Do not restore power until all components are fitted correctly into the system and
all connections have been made properly.
Power supply
Keyboard and mouse
Video monitor
Section 5
Oct 2021
13

Advertisement

Table of Contents
loading

Table of Contents