Exterior Loading; Merchandisers Shipped With End Installed; Shipping Braces; Leveling - Hussmann EXCEL PW Installation & Service Manual

Medium temperature. bulk produce and bakery merchandisers
Table of Contents

Advertisement

1-2
R
I
1-2
efRigeRation
NSTALLATION
CAUTION
Do not store items or flammable
materials atop the unit.
Do not walk on case.

EXTERIOR LOADING

Do NOT walk on top of merchandisers or
damage to the merchandisers and serious
personal injury could occur. T
STRUCTURALLY DESIGNED TO SUPPORT EXCESSIVE
such as the weight of a
EXTERNAL LOADING
person. Do not place heavy objects on the case.
MERCHANDISERS SHIPPED
WITH END INSTALLED
If the case was shipped with the end installed,
two long bolts were used to hold the shipping
brace to the end. If the shipping bolts are
reinserted after removing the brace, they will
extend into the product area. T
SURE TO REPLACE THESE BOLTS WITH THE SHORT
. NSF requires any bolt or
ER BOLTS PROVIDED
screw in the product area be capped or cut off if
it has more than three exposed threads.
NOTE:
Be careful not to damage the factory installed
end while moving the case. Make sure that tools
are positioned past the end and beneath the
merchandiser's support bar.

SHIPPING BRACES

Move the merchandiser as close as possible to
its permanent location and then remove all
packaging. Check for damage before discard-
ing packaging. Remove all separately packed
accessories such as kits and shelves.
P/N 0518258_C
P/N 0518258_D
/ e
lectRical
HEY ARE NOT
,
HEREFORE
BE
-
U.S. & Canada 1-800-922-1919 • Mexico 1-800-890-2900 • www.hussmann.com
U.S. & Canada 1-800-922-1919 • Mexico 1-800-890-2900 • WWW.HUSSMANN.COM
WARNING
Do NOT remove shipping braces until
the merchandisers are positioned
for installation.

LEVELING

Merchandisers must be installed level to ensure
proper operation of the refrigeration system
and to ensure proper drainage of defrost water.
When leveling merchandisers, use a carpenter's
level as shown. Leveling shims are provided
with each merchandiser for use if needed. The
shims are big enough so that you can level
adjoining merchandisers at the same time using
one shim.
NOTES:
• B
EGIN LINEUP LEVELING FROM THE HIGHEST
POINT OF THE STORE FLOOR
• If shimming two corners, check to see if a shim
is needed in the center of the merchandiser. If a
gap exists between the support rail of the
merchandiser and the floor, a shim should be
placed in the center.

JOINING INSTRUCTIONS

Sectional construction means that two or more
merchandisers may be joined in line yielding
one long continuous display requiring only one
pair of ends.
A
LL JOINTS MUST BE AIR
FORMATION OF ICE OR CONDENSATION
.
-
TIGHT TO PREVENT
.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Excel mwg

Table of Contents