Nortel DMS-100 Series Maintenance Manual page 298

Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

7-78 OPM alarm clearing procedures
RMM
major
(continued)
28
29
30
31
297-8361-550 Standard 04.01 September 2000
LINK
0: RMM 0 0;CAP MS;STATUS:SysB,;MSGCOND: CLS
LINK
1: RMM 0 1;CAP MS;STATUS:SysB,;MSGCOND: CLS
LINK
2: ESA 0 0;CAP
LINK
4: ESA 0 1;CAP
To busy the link that has faults, type:
>BSY LINK link_no
and press the Enter key.
where
link_no
is the number of a P-side link from step 27
To test the ManB link, type:
>TST LINK link_no
and press the Enter key.
where
link_no
is the number of the link (0 or 1) manually busied in step 28
If test
passes
fails
To return the link to service, type:
>RTS LINK link_no
and press the Enter key.
where
link_no
is the number of the link (0 or 1) tested in step 29
If RTS
passes
fails
To post the ManB RMM, type:
>POST RMM rmm_no
and press the Enter key.
where
rmm_no
is the number of the RMM manually busied in step 5
S;STATUS:
OK,;MSGCOND: OPN
S;STATUS:
OK,;MSGCOND: OPN
Do
step 30
step 36
Do
step 31
step 36

Advertisement

Table of Contents
loading

Table of Contents