Installation; General; Preparation - Baxi PRIME Series Installation Manual

Condensing gas wall-hung boilers
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
1
2
6
7
Do not leave any packaging (plastic bags, polystyrene, etc.) within the reach of children as they are a potential source of danger.
6.

INSTALLATION

6.1

General

The boiler must be installed in accordance with the standards in force and the recommendations in this manual.
6.2

Preparation

After deciding the exact location of the boiler, fix the template to the wall. Connect the system to the gas and water inlets. Make
sure the rear part of the boiler (back) is as parallel as possible to the wall (otherwise, shim the lower part). If you are either installing
the boiler on an existing system or replacing one, as well as the above, fit a settling tank under the boiler on the system return line
in order to collect any deposits and scale circulating in the system after flushing. After fixing the boiler on the wall, connect the flue
and air ducts. Connect the siphon to a drain trap, making sure the slope is continuous. Avoid horizontal stretches.
It is prohibited to keep flammable products and materials near the boiler or in the same room, even for short periods.
The boiler must be installed in a room protected against frost. Make sure that the boiler is installed near a connection to the
mains drainage system for draining the condensate. In case is installing the unit in environments with temperatures lower than
0°C, take the necessary precautions to avoid the formation of ice in the siphon and in the condensation drain.
7696306 (01-12/17)
3
4
8
9
b
LIFT
18
5
10
a
LIFT
BO-0000071

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prime 1.24Prime 26Prime 30

Table of Contents