Installation - Baxi System 35/60 Installation And Servicing Instruction

Gas fired wall mounted system boilers
Hide thumbs Also See for System 35/60:
Table of Contents

Advertisement

Appliance Wall Plate
190mm
For Side Flue Exit
Fig. 14
Flushing Tube
Central Heating Return
Fig. 15
Fixing Template
107mm Dia Minimum
Aperture For Flue Tube
200 mm
Minimum
Clearance
Vertical Flue
Centre Line
Boiler Mounting Bracket Fixing Slots
Drill 8 mm diameter x 50 mm deep
System
Boiler
FIXING
TEMPLATE
5 mm Minimum
Side Clearance
IMPORTANT
Profile of
Outercase
Keep rear routed pipework, clips
and electrical cables clear of all
shaded areas to allow the
correct fitting of the boiler chassis
General
Area For
Electrical
Supply
Drill 8 mm diameter x 50 mm deep
95 mm
130 mm
Heating
Gas
Flow
Inlet
(22mm)
(22mm)
200 mm
Minimum
Clearance
Horizontal Side Flue
Centre Line
8.1
The gas supply, gas type and pressure must be
checked for suitability before connection (see
Section 7.6).
1. After considering the site requirements
(see Section 7.0) position the fixing template
(Fig. 14) on the wall ensuring it is level both
horizontally and vertically.
2. Mark the position of the two most suitable
fixing slots for the wall plate and boiler lower
fixing holes. It is preferable to use the horizontal
fixing slots.
3. Mark the position of the centre of the flue hole
(rear exit). For side flue exit, mark as shown.
4. Note the shaded area on the template.
Pipework may be routed upwards behind the
boiler, providing it does not conflict with the
shaded area.
5. If required, mark the position of the gas and
water pipes. Remove the template.
5 mm Minimum
Side Clearance
6. Cut the hole for the flue (minimum diameter
107mm).
7. Drill the wall as previously marked to accept
the wall plugs supplied. Secure the wall plate
Boiler Lower Fixing Holes
using the fixing screws.
8. Using a spirit level ensure that the plate is
level before finally tightening the screws.
130 mm
65 mm
9. Connect the gas and water pipes to the valves
Heating
Pressure Relief
Return
Valve
on the wall plate using the copper tails supplied.
(22mm)
(15mm)
Ensure that the sealing washers are fitted
between the connections.
Wall Plate
8.2
1. Connect a tube to the central heating flow or
return pipe (Fig. 15).
2. Flush thoroughly (see System Details, Section
6.2).
8.3
1. Remove all packaging.
2. Stand the boiler on its base by using the rear
lower edge as a pivot.
Baxi UK Limited declare that no substances
harmful to health are contained in the
appliance or used during appliance
manufacture.

8.0 Installation

Initial Preparation
Flushing
Preparing The Boiler
NOTE: A small amount of water may drain
from the boiler in the upright position.
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

System 60/100

Table of Contents