Installation (cont'd)

Lifting and Transport Instructions

1. The VR3 can be lifted by a forklift at typical lifting
points.
2. Ensure lower body panels are removed before lifting
with a forklift. Serious damage will occur if the body
panels are not removed.
3. Make sure that fork spacing and width will not damage
drain or come in contact with piping, or electrical lines
4. Be sure that the forks are long enough to support
beyond the center of the case but not damage near
components. Check for proper balance before moving.
A minimum fork length of 36" is recommended for 68"
wide cases
5. The VR3 merchandiser can be raised at one end
underneath the deck with a forklift to allow the
placement of rollers or dollies.
6. Evenly support the entire base structure on rollers or
dollies before attempting to move. Each Base Leg
must have its own dollie to properly support the case.
Lifting Points are typical and dependent upon size of case
and refrigeration application, drainage configurations will
call for altercations in Lifting Zones.
Below are the following drainage configurations and lifting
should be altered to the expected model.

VR3 M/F Drain Location

Service Drain
Bottom Drain
(Underneath Deck)
WARNING
Improper placement of forks may damage
drainage piping. Use a spotter when placing
forks. Make sure that piping will not be dam-
aged. Use J-Bars or Jacks if forks cannot be
used safely