Maintenance Log - Trane Voyager RT-SVX17C-EN Installation Operation & Maintenance

Commercial 27 1/2 to 50 ton 60 hz commercial 23 to 42 ton 50 hz cv or vav rooftop air conditioners with reliatel controls
Table of Contents

Advertisement

Table 28
Sample Operator's Maintenance Log (See Note)
Current
Ambient Compr.
Temp.
Oil
Date
(F)
Level
- ok
- low
- ok
- low
- ok
- low
- ok
- low
- ok
- low
- ok
- low
- ok
- low
- ok
- low
- ok
- low
- ok
- low
Note: Check and record the data requested above each month during the cooling season with the unit running.
Refrigerant Circuit #1
Suct.
Disch.
Liquid Super-
Press.
Press.
Press.
(Psig)
(Psig)
(Psig)
Sub-
Compr.
Suct.
heat
cool.
Oil
Press.
(F)
(F)
Level
(Psig)
- ok
- low
- ok
- low
- ok
- low
- ok
- low
- ok
- low
- ok
- low
- ok
- low
- ok
- low
- ok
- low
- ok
- low
62
Refrigerant Circuit #2
Disch.
Liquid Super-
Press.
Press.
heat
(Psig)
(Psig)
(F)
Sub-
cool.
(F)

Advertisement

Table of Contents
loading

Table of Contents