CHAPTER 3
Preparing the Site for M320 Router
Installation
M320 Site Preparation Checklist Requirements
Table 14: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed router
tolerances.
Power
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the configuration.
Rack
Verify that your rack meets the minimum
requirements for the installation of the router.
Copyright © 2010, Juniper Networks, Inc.
All manuals and user guides at all-guides.com
M320 Site Preparation Checklist Requirements on page 41
Rack Requirements for the M320 Router on page 42
M320 Clearance Requirements on page 44
M320 Cabinet Requirements on page 45
The checklist in Table 14 on page 41 summarizes the tasks you need to perform when
preparing a site for router installation.
For More Information
"M320 Environmental Specifications"
on page 247
"M320 Chassis Grounding Cable and
Lug Specifications" on page 250
"M320 Power Requirements" on
page 250
"M320 Chassis Description" on
page 6
"Rack Requirements for the M320
Router" on page 42
Performed By