Calibration
●
●
●
●
●
●
●
●
●
●
10
Call up function
1.
Do not attach a weight, or remove the weight.
Acknowledge the measurement.
The measured value appears in box 2.
Record the value from box
Call up function
3.
Attach appropriate weight (
Acknowledge the measurement.
The measured value appears in box 4.
Record the value from box
Carry out all measurements from
sponding values in the calibration certifi cate.
After completing all measurements, quit the calibration menu.
Industrial
2 in the calibration certifi cate.
500 cN)
4 in the calibration certifi cate.
100 cN to 1000 cN in succession and record the corre-
2
4
3
1