Installation; Installation Conditions; Preparation For Installation; Mounting The Actuator - Samson TROVIS 5757-3 Mounting And Operating Instructions

Electric actuator with process controller for domestic hot water heating
Hide thumbs Also See for TROVIS 5757-3:
Table of Contents

Advertisement

5 Installation

5.1 Installation conditions

Work position
If not described otherwise in the valve docu-
mentation, the work position for the control
valve is the front view looking onto the oper-
ating controls.
Mounting orientation
The control valve can be installed in the
pipeline in any desired position. However, a
suspended mounting position of the actuator
is not permissible (see Fig. 5-1).
The cable gland must not face upward after
installation.
0...90°
0...90°
Fig. 5-1: Mounting position
EB 5757 EN

5.2 Preparation for installation

Before installation, make sure the following
conditions are met:
− The actuator is not damaged.
Proceed as follows:
Lay out the necessary material and tools to
have them ready during mounting.

5.3 Mounting the actuator

!
The actuator is mounted directly onto the
valve (see Fig. 5-2).
1 Electric actuator with process
controller
2 Coupling nut
Fig. 5-2: Mounting
Installation
1
2
5-1

Advertisement

Table of Contents
loading

Table of Contents