Maintenance Procedure - Buderus Logano GA224 Installation, Operation And Maintenance Manual

Sealed combustion hot water
Table of Contents

Advertisement

Maintenance

12.2 Maintenance Procedure

Maintenance should only be performed by a qualified
service technician. When replacing parts, use only
Buderus authorized components. Maintenance should
be done on a yearly basis. Results of the inspection
must be recorded on the form provided on page 35.
Comments below refer back to points of maintenance
record list on page 35.
1.: Examination of venting system, including
combustion, ventilation and intake air components
Inspect the venting system including the combustion,
ventilation and intake air openings. Any repairs
identified must be corrected immediately.
Ensure that there is no obstruction of combustion, air in-
take and ventilation air flow.
2.: Inspection of boiler
DANGER !
due to electric power with opened boiler
jacket panel.
DANGER!
z Before removing the boiler front jacket
panel: disconnect electric power to
appliance or turn off power switch to the
appliance.
z Protect the system against accidental
power up.
We reserve the right to make any changes due to technical modifications!
Installation, Operation and Maintenance Manual Sealed Combustion Gas Boiler Logano GA244 • Issue 02/2004
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
12
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents