Installation Of Horizontal Wall Terminal Body - Buderus Logano GA224 Installation, Operation And Maintenance Manual

Sealed combustion hot water
Table of Contents

Advertisement

10
Installation of the Exhaust and Air Intake System

10.1 Installation of Horizontal Wall Terminal Body

Read these instructions first completely concerning
horizontal termination body installation and observe the
noted safety precautions.
The horizontal wall terminal body must be installed
through the wall according to previously mentioned
codes and/or local requirements.
z Make a 6" round opening in the outside wall at the
desired location. Refer to the information on the next
page regarding limitations of termination location.
z Remove fresh air connection end from the terminal
body and insert terminal body from the outside
through the round 6" hole in the wall (Fig. 8). Install
fresh air connection piece. Secure wall plate with 4
furnished screws to the wall.
z Insert a 2 or 3 foot straight exhaust pipe (Fig. 9,
Item. 2) from the outside into the wall terminal body.
Slide termination tee on exhaust pipe and seal joint
with silicone (Fig. 9, Item. 3). Orient termination tee
horizontally and observe the manufacturer's
installation instructions.
We reserve the right to make any changes due to technical modifications!
Installation, Operation and Maintenance Manual Sealed Combustion Gas Boiler Logano GA244 • Issue 02/2004
18
Fig. 8
Installation of horizontal wall terminal body
1
Fig. 9
Installation of exhaust pipe
Item. 1: wall terminal body
Item. 2: Exhaust vent pipe
Item. 3: Termination tee
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
2
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents