Buderus Logano GA224 Installation, Operation And Maintenance Manual page 11

Sealed combustion hot water
Table of Contents

Advertisement

Boiler Water Connections
z Install the 90° street elbow (Fig. 6) and the relief
valve (Fig. 6 ) on the boiler supply connection.
z Install relief valve according to ANSI/ASME Boiler
and Pressure Vessel Code, Section IV. Mount the
relief valve stem vertically. Use ¾" street elbow as
needed.
NOTICE !
Observe local and state codes when
installing the boiler.
FIRE DANGER !
due to hot piping.
z Maintain a minimum 2" clearance
DANGER!
between the hot water piping and
combustible walls.
Water treatment
NOTICE !
Perform a water analysis prior to filling the
boiler system. Treatment of the boiler
water may be required depending on the
analysis results.
For extremely hard water or pH value
below 7.0 consult your local water
treatment company.
We reserve the right to make any changes due to technical modifications!
Installation, Operation and Maintenance Manual Sealed Combustion Gas Boiler Logano GA244 • Issue 02/2004
1
2
Fig. 6
Rear view
Item. 1: Gas boiler
Item. 2: Boiler supply connection
Item. 3: Relief valve
Item. 4: Boiler supply pipe
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
6
3
4
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents