Buderus Logano GA224 Installation, Operation And Maintenance Manual page 38

Sealed combustion hot water
Table of Contents

Advertisement

12
Maintenance
Removal of gas burner:
1. Shut-off main gas piping shut off valve.
2. Remove the screws from the boiler front access
panel (Fig. 30, Item. 1) and remove the boiler front
access panel (Fig. 30, Item. 2).
3. Turn the gas control knob (Fig. 31, Item. 1)
counterclockwise to "OFF". Do not force.
DANGER
due to explosion of the gas.
z Wait five (5) minutes to clear out any
WARNING!
gas. Then smell for gas, including near
the floor. If you smell gas, STOP!
Follow "B" in the safety information on
page 28. If ou do not smell gas, go to
the next step.
We reserve the right to make any changes due to technical modifications!
Installation, Operation and Maintenance Manual Sealed Combustion Gas Boiler Logano GA244 • Issue 02/2004
38
Fig. 30
Removal of boiler jacket front panel
Item. 1: Screws
Item. 2: Boiler jacket front panel
1
Fig. 31
Gas control valve
Item. 1: Gas valve knob (set to "ON")
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
2
1
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents