INSTALLATION INSTRUCTIONS
TECHNICAL DATA
Gas connection
Pressure test point
Gas rate adjustment
Aeration adjustment
Electrical connection
Professional 60
C60DP
BURNER
HOTPLATE
Front left
HOTPLATE
Rear right
HOTPLATE
Front right and Rear left
Total load
Traditional 60
C60DT
BURNER
HOTPLATE
Front left and rear right
HOTPLATE
Front right and rear left
Total load
34
Rp
1
/
(
1
/
" BSP female)
2
2
Front left hotplate injector
None
None
4mm
2
twin and earth
230/240V a.c. 50Hz.
G20 at 20mbar
HEAT
INJECTOR
INPUT
4.1 kW
100 + 72 + 100
3.0 kW
116
2.0 kW
103
G20 at 20mbar
HEAT
INJECTOR
INPUT
3.0 kW
116
2.0 kW
103
G30 at 28-30mbar
G31 at 37mbar
HEAT
INPUT
3.8 kW (275g/h) 63 + 42 + 63
3.0 kW (220g/h)
2.0 kW (145g/h)
4.5 / 4.9 kW
G30 at 28-30mbar
G31 at 37mbar
HEAT
INPUT
3.0 kW (220g/h)
2.0 kW (145g/h)
4.5 / 4.9 kW
INJECTOR
86
70
INJECTOR
86
70