Frost
protection limit temperature (outside temperature threshold)
Under this menu
item
the limit temperature for the frost protection
(outside temperature threshold) is set. It
is
only effective
if
Room and
outdoor temp.
or
Room and outdoor temp.
is
set
in
the
Frost
protection
menu.
&
NonCE:
Domestic hot water pi pework may freeze
if
the
I
frost
protection limit temperature
is
set too low and in
prolonged periods with outside temperature below 0
D C.
~
Adjust frost protection limit temperature (default
setting
=
5°C) to the heating system
_
~
Do not set the frost protection
limit
temperature too
low.
Damages caused by a low frost protection
limit
temperature are not covered by the
warranty.
~
Set the frost protection limit temperature and frost
protection for all heating/cooling
circuits.
~
To ensure frost protection for the entire heating
system.
set either
Room and outdoor temp.
or
Room and outdoor temp.
in
the
Frost protection
menu.
If
the outside temperature
exceeds
the frost
protection
limit
temperature by 1 K
(O
C) and there is no heat requirement from the
heating system, the heating pump switches off.
• If
the
outside
temperature
drops below the frost protection limit
temperature. the heating pump switches on.
Service menu
The
Room temperature
setting does not
offer absolute
frost protection. because pipework
installed
in
fa~ades.
for
instance.
can
freeze.
This can happen even though
the temperature in the reference room is considerably
above 5°C as the
result
of outside heat sources. As an
outside temperature sensor is installed. frost protection
can be assured for the entire heating
system:
~
In the
Frost protection
menu. set either
Room and
outdoor temp.
or
Room and outdoor temp
..
6.3.4
Screed drying menu
A screed drying program
is
set for the selected heating circuit or the
entire heating system in this menu. To
dry
a
new
screed the heating
system automatically runs the screed
drying
program once.
In case of a voltage failure the user interface automatically continues
with the screed drying
program.
The voltage failure. however. may not
last
longer
than the power reserve of the user
interface
or a maximum
duration of an interruption.
This menu
is
only available if at least one underfloor heating circuit
is
installed and set in heating
system.
&
NOTICE:
Risk of damaging or destroying the screed!
,
~
With multi-circuit systems. this function can only be
used in combination with a heating circuit with
mixing
valve.
~
Set the screed drying according to the instructions of
the manufacturer.
~
In spite of the screed drying function. visitthe system
daily and keep the
prescribed
records.
I
Dwell time before start
No dwell time
The screed drying program starts after
the
set waiting time
(selected
heating circuits are switched off
I
Start phase duration
Start phase temperature
Heat-up
phase step width
Heat-up phase
temp.
diff
Holding phase duration
I
Holding phase temp.
Cool-dn phase step wdth
,
Cool-down phase
t.diff
Endphase duration
I
tEnd
phase temperature
Max.
interruption time
Screed
dry.
system
,
1
...
50days
No start phase
1
...
3
...
30days
20
...
25
...
55°C
No heat-up phase
1
...
10 days
1...
5
...
35K
1
...
7
...
99 days
20
...
55
°C
No cool-down phase
1
...
10 days
1...
5
...
35K
I
during
the waiting
time. frost protection
is
active;
default
setting:
no
waiting time.
~
Fig.
13.
time before
day 0)
TIme
lag
between the beginning of the start phase and the next phase
(~
Fig. 13. [1])
Flow temperature during the start phase
(
~
Fig. 13.
[1))
TIme
lag
between the steps
(step width) in the
heat-up phase
(~
Fig.
13]3])
Temperature differential between the steps
in
the
heat"\Jp
phase
(~
Fig.
13. [2])
~
Time
lag
between the beginning of the holding phase
(duration
of the maximum temperature for screed
drying) and the next phase
(~Fig.
13. [4])
Flow temperature during the holding phase
(
~
Fig.
13.
[4])
Time lag between the steps
(step
width)
in
the
cooling
phase
(
~
Fig.
13.
[5))
Temperature
differential between the steps
in
the
cooling
phase
(
~
Fig.
13.
[6])
No
end phase
TIme lag
between the beginning of
the
end phase
(last temperature
step) and the end of the
screed
drying
""
p
-e-
r m -a -ne
-
n
-:
U
-
y
- - ' - - - - -
program
(~
Fig.
13.
[7])
UOdays
1
20 ...
25
...
55"C
2
...
12
...
24h
Yes
No
Flow temperature during end phase
(
~
Fig.
13. [7])
Maximum duration of a screed drying
interruption
(e.g. through stop of the screed or power failure) until a
fault display
is
output.
-----------
Screed drying
is
active for all heating
circuits
of the system
Notice:
Single heating circuits
cannot
be
selected.
DHW heating is not
possible.
The menus and menu
items with
settings
for
DHW are
disabled.
Screed drying
is
not active for all heating
circuits
I
Notice:
Single
heating
circuits can be
selected.
DHW heating
is
possible.
The menus and menu
items
with
settings for DHW are
enabled.
~--------~----------~--------------
Table
30
Setting in the Screed drying menu (Fig.
13
shows the default setting
of
the screed drying program)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents