Installing The Virtual Services Platform 4000 In An Equipment Rack - Extreme Networks ExtremeSwitching Virtual Services Platform 4450GTX-HT-PWR+ Installation Manual

Table of Contents

Advertisement

Installing the VSP 4450GTX-HT-PWR+
Installing the Virtual Services Platform 4000 in an
equipment rack
To install the VSP 4000 switch in an equipment rack, perform this procedure.
Prerequisites for installing the VSP 4000 in an equipment rack:
• Ensure that you have a space of 1.75 inches (4.45 centimeters) in height for each switch in an
EIA or IEC-standard 19-inch (48.2-centimeter) equipment rack.
• The rack is bolted to the floor and braced if necessary.
• The rack is grounded to the same grounding electrode used by the power service in the area.
The ground path must be permanent and must not exceed 1 Ohm of resistance from the rack
to the grounding electrode.
Caution:
When you mount the device in a rack, do not stack units directly on top of one another. You
must secure each unit to the rack with the appropriate mounting brackets. Mounting brackets
cannot support multiple units. For a translation of this statement, see
messages
on page 39.
1. Attach the L-bracket to each side of the switch using a #2 Phillips screwdriver as illustrated
below.
August 2018
Installing the Virtual Services Platform 4450GTX-HT-PWR+
Translations of safety
22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec4400a03-e6

Table of Contents