Preparing The System For Operation - IBM Power System 9008-22L Manual

Pcie adapters
Hide thumbs Also See for Power System 9008-22L:
Table of Contents

Advertisement

Figure 38. Installing a filler in a PCIe adapter slot in a 9008-22L, 9009-22A, or 9223-22H system
Preparing the 9008-22L, 9009-22A, or 9223-22H system for operation after permanently
removing a PCIe adapter
To prepare the system for operation after permanently removing a PCIe adapter, complete the steps in
this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Slide the service access cover (A) onto the system unit.
3. Close the release latch (B) by pushing it in the direction shown.
Installing, removing, and replacing PCIe adapters in the 9008-22L, 9009-22A, or 9223-22H system 57

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power system 9009-22aPower system 9223-22h

Table of Contents